Cook Enterprises
Renovations & Additions · Coastal North Carolina

Renovations and additions, done in the right order

A renovation is a dozen trades working in sequence. We run the whole thing — design coordination, permits, framing, plumbing, electrical and finish — so you have one contact and one schedule.

Request an estimateCall (252) 555-0100
Scroll to build
What we handle

Renovations & Additions on the Crystal Coast

  • Kitchen remodels Layout to finish
  • Bathroom remodels Showers, tile & fixtures
  • Home additions Bedrooms, suites & bonus rooms
  • Whole-home renovations Older & inherited homes
  • Structural changes Wall removal & beams
  • Flood-zone planning Substantial improvement review
Coastal considerations

Built for the coast

In a flood zone, a large renovation can trigger the substantial improvement rule: if the cost of the work reaches 50 percent of the building's market value, the whole house may need to meet current flood requirements, including elevation. We look at that before you're committed, not after.

Additions on elevated homes have to match the existing floor height and tie into the existing roof and framing. Those connections are what keep an addition from leaking or settling.

We choose materials that tolerate humidity: moisture-resistant board in baths, proper vapor management, and ventilation that keeps mold from getting a start.

What to expect

How the job runs

We start with what you want the space to do, then walk the house to see what's behind the walls. You get a written scope, a price and a schedule.

During the job you have one point of contact and a weekly update. Inspections, deliveries and trades are coordinated on our end.

Questions we get

Renovations & Additions FAQ

What is the 50% rule?

For homes in a FEMA flood zone, if the cost of improvements or repairs reaches 50 percent of the structure's market value, the building generally must be brought into compliance with current floodplain rules. Your local floodplain administrator makes the determination; we help you plan the project around it.

Can I stay in the house during a renovation?

For many kitchen, bath and addition projects, yes. Whole-home work usually goes faster and safer with the house empty. We'll talk through what living there during the job would look like.

Do you handle design?

We work from your ideas or from plans by your architect or designer, and can bring in a designer if you need one. Either way, we make sure the plan is buildable and priced before work starts.

How long does a kitchen remodel take?

It depends on scope and on lead times for cabinets and materials. Once the plan is set, we give you a schedule and order the long-lead items early.

Next step

Talk to us about your project

Tell us what's going on and where the property is. We'll set up a time to walk it and give you a straight answer on scope, timeline and cost.

Request an estimate
Related services